Pavement Markings

Striping or pavement marking is applied with paint to a specific width and length based on the space and requirements. Properly marked parking lots provide an easier to maneuver and safer experience for drivers. Striping should be maintained with frequency (between 12 and 24 months depending on the climate).
The Process
Prepare the Surface
We remove any debris from the surface so the markings apply properly.
Apply the Markings
We apply the markings to the pavement.
Dry & Cure
We let the markings dry fully before allowing you to resume use of the pavement.

Key Benefits
- A Much Needed Facelift
- Maximize Your Space
- Increase Business
- Increase Safety
- Keep Customers Satisfied
- Remain Compliant
Self- Performing Locations
Field Office Locations
If you have a job outside our service area, our Pave America partners can help.